Greif Board

Cogeneration Project

Cummins & Barnard Services

  • 6.5 MW Cogeneration Design
  • 1 x ERI Heat Recovery Steam Generator (100,000 pph)
  • Infrastructure Modifications
    - Auxiliary Systems - 69 kV Substation - Process System Tie-ins
  • Special Design Constraints
    - Soil Conditions
    - Limited Site Space
  • Co-development and Engineering
  • EPC – TBCB